“This necessitated precautionary operational measures, consisting of disconnecting a number of generating units to preserve the safety of the plant and its workers, and to ensure the stability of the electrical grid,” the ministry said in a statement.
“The Ministry confirms that all operational and emergency plans were activated immediately upon the occurrence of the incident, ensuring the continuity and stability of both the electricity and water networks and limiting any potential impact on service, with technical and operational monitoring continuing around the clock,” it added in the statement.
- Al Jazeera









