The review of the Reporting Documentation was a very thorough and intensive process spanning seven months.
FIA confirms that the review process is particularly time-consuming, considering both the complexities of the Financial Regulations and the necessity to assess technical aspects (and related cost treatment) of activities of development undertaken by F1 Teams and PU Manufacturers.
The FIA confirms that all F1 Teams and all PU Manufacturers gave their full support in providing the required information. The CCA notes that all F1 Teams and all PU Manufacturers acted at all times in a spirit of good faith and co-operation throughout the process.
The review findings are as follows:
F1 Teams review process results:
- 9 F1 Teams found in compliance for 2024, and a Procedural Breach was identified for AMR GP Ltd (AMR).
- The CCA confirms that although AMR is in Procedural Breach, it has not exceeded the Cost Cap level, and that the Procedural Breach was of a very minor nature, originating from unpredictable circumstances outside the control of the F1 Team. AMR and FIA have entered an ABA on 29 September 2025 to resolve the matter.
PU Manufacturers review process results:
- All 5 PU Manufacturers are found in compliance for 2024.
(Source: FIA)
Latest News
THRIVE project advances women’s empowerment and resilience in Kilinochchi
Indian rescuers search for 22 people missing after cargo ship sinks
New Zealand to introduce bill banning social media for children under 16
Afghanistan joins rotation for Asian Cricket Council presidency
Syria, Israel hold US-mediated talks to ease tensions, Syria news agency says
Ridley Scott Says ‘I’m Not a Filmmaker, I’m an Influencer’
Sri Lanka opens new offshore oil and gas exploration
SINGER recognised as Lanka’s ‘Fastest Growing Brand’ and ‘Most Valuable Retail (General) Brand’
Shelley Fabares, ‘Coach’ and ‘The Donna Reed Show’ Star, Dies at 82
EU-India FTA raises concerns over Sri Lanka exports